Skip To

  • Skip to Contents
  • Jump to Navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Close Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    Have Your Say at Greater Wellington Regional Council
    • Home
    • Sign In
    • Register
    Have Your Say at Greater Wellington Regional Council
    • Home
    • Sign In
    • Register

    You are here:

    • Home
    • Te Kāuru Upper Ruamāhanga Floodplain Management
    Go Back

    Documents

    • File TKUR Phase 1 Environmental Values Report SUMMARY: Phase 1 of the Floodplain Management Plan process involves the compilation of information about the values and characteristics of the Upper Wairarapa Valley (the ‘Study Area’). (3.9 MB) (PDF)
    • File TKUR Phase 2 Vision and Aims Report SUMMARY: This report sets out the Flood Management Vision and corresponding issues and aims which inform Phase 2 (14.1 MB) (pdf)
    • File TKUR Phase 1 Summary Report (211 KB) (docx)
    • File TKUR Phase 1 Summary Report Maps (173 MB) (PDF)
    • Home
    • Terms and Conditions
    • Privacy Policy
    • Moderation Policy
    • Accessibility
    • Technical Support
    • Site Map
    Powered by Engagement HQ Powered by Engagement HQ